Soulriders 5.0: Legend of the Unending Games

The Burial Grounds => Old Games 8 => Ranma Visual Adventure => Topic started by: Brian on October 24, 2011, 01:55:41 PM

Title: Milestones/due-dates
Post by: Brian on October 24, 2011, 01:55:41 PM
Instead of using the complex, formalized system, I'll use a much simplified list of 'current objective' and 'projected completion date'.  Maybe with intermediate dates throughout, if applicable.  This isn't much of a system, but it works for me ... should be flexible enough to support 1-2 other people if they want to pitch in.  Help really would be appreciated, but I did aim so low that I could do it solo if I have to.

Except maybe the tech side of things. <_<



Current Objective: Outline for story of trunk with explanations for options.

Due: Finalize by 10/31/2011.


Upcoming objectives:

Write story for trunk.
-Create simple map of decision tree (as such).
Develop Branch A (the Akane/Ukyou path) and outline it.
Develop Branch B (the Shampoo/Kodachi path) and outline it.
Plan endings (name each after the girl featured in it for simplicity).
Outline/write endings.
Bribe someone with technical skill to import the story into an engine once I'm done making content.